top of page
Logo white with invisible background

MASTER LIST

Complete each step in the order provided.
Do not skip any steps. 

STEP 1: GATE

GATE

STEP 1:

01.png

UNLOCK THE GATE

Use the code you were provided to unlock the padlock. 

LINE_edited.png
ChatGPT Image May 25, 2026 at 01_49_00 PM.png
02.png

RELOCK THE PADLOCK ONTO THE GATE

LINE_edited.png
03.png

SECURE THE GATE

Attach the gate to the wall and fence using the chains.

IMG_7931.HEIC
GATE.jpg
STEP 2: PARKING LOT DOOR

PARKING LOT DOOR

TO UNLOCK

Enter your code on the keypad, then press the ULTRALOQ logo.

TO LOCK

Press the ULTRALOQ logo.

IMG_7671 2.jpg
01.png

STEP 2:

STEP 3: DISARM ALARM

ALARM - UNARM

STEP 3:

01.png

LOCATE KEYPAD

When you enter through the parking lot door the keypad will be on the wall to your right.

IMG_0074.HEIC
LINE_edited.png
02.png

ENTER YOUR CODE AND PRESS 'STANDBY' TO DISARM

Disarm within 60 secs or alarm will sound.

i

EMERGENCY CONTACT

IMG_7670-2_edited.png

If alarm does not and the countdown beeps call: 365-675-4200

STEP 4: SHAW ST GARAGE

SHAW ST GARAGE

STEP 4:

01.png

UNLOCK THE PADLOCK

Use the code you were provided to unlock the padlock. 

LINE_edited.png
Shaw Garage Door.jpg
02.png

UNLOCK CANE BOLT

From the inside, pull up the cane bolt and then slide the garage door to the right to open.

LINE_edited.png
03.png

STORE THE PADLOCK

Leave the padlock on ledge beside door shown in image.

Shaw Door interior_edited.jpg
IMG_7702-2.jpg
STEP 5: PARKING LOT GARAGE DOOR

PARKING LOT GARAGE DOOR

STEP 5:

01.png

UNLOCK DOOR

Slide the 2 metal levers on the left and right of the door open

LINE_edited.png
ParkingLot Door.jpg
02.png

OPEN THE DOOR

Use the rope to lift and open the door

IMG_8117.HEIC
STEP 6: SHAW ST DOOR

OPENING - SHAW ST DOOR

STEP 6:

01.png

SHAW DOOR

Shaw Ave door locks automatically. To keep it unlocked, put a zip tie on the door handle.

IMG_0056.HEIC
PARKING

PARKING

01.png

EVIL EMPIRE PARKING

Only park in the 'Evil Empire Parking' spaces or the loading zone in front go the garage door. Do not park in Crown labeled spaces.

IMG_7674_edited.jpg
LINE_edited.png
02.png

CARS INSIDE WAREHOUSE

Vehicles can enter the building using the Shaw St. garage door

LINE_edited.png
03.png

PAID PARKING

Paid parking is across the street off of Victoria Ave.

IMG_0071_edited.jpg
EE - Parking - Shoot & Scout Days.jpg
WAREHOUSE LIGHTS

WAREHOUSE LIGHTS

01.png

LOCATE REMOTE

Light remote is located in the mesh container on the centre beam

LINE_edited.png
Remotes2_edited.jpg
02.png

PIN POINT WHICH LIGHTS TO CONTROL

The remote controls the lights in the Warehouse and the Dark Studio. Point the remote up at the lights you want to control. 

IMG_7933.HEIC

i

To only control the warehouse lights place yourself in the warehouse behind the shipping container and point the remote at the warehouse lights

HEATING

HEATING

01.png

TURNING HEAT ON/OFF

Use the wooden stick beside the breaker panel and flip the 2 light switches above the breaker:
UP = ON
DOWN = OFF

Heat.jpg
LINE_edited.png
02.png

TURN OFF TUBE HEATERS

Use the breaker panel between the container and wall to turn off Tube Heater. Its labeled "Tube Heater" on the bottom left of the panel

Heat Panel.jpg

i

Temperature is controlled by Google Nests and sets to 21° during shoot days. To change temperature message 365-675-4200. Do not change the temp or turn it up. It won't increase faster.

FANS

FANS

01.png

LOCATE REMOTE

Remote is located on the middle beam.
Fan Icon  = ON/OFF
+/- Icon  = SPEED

Fan.jpg

i

Fans help to distribute the heat so turn when you can if space feels cold

BREAKER PANELS

BREAKER PANELS & STUDIO POWER

01.png

BREAKER PANELS

Panel 1: located on the white wall in centre area near office containers
Panel 2: located around the corner from panel 1 between the container. and wall

Breaker Panels.jpg
LINE_edited.png
02.png

POWER

The studio has 2x 15 amp plugs and 2x 20 amp plugs located on the centre beam.

IMG_0055.HEIC
DUNGEON POWER

DUNGEON POWER

01.png

RUNNING POWER TO DUNGEON 

You will need to run AC power cords (100 ft) from the centre beam to the basement.

LINE_edited.png
IMG_0055.HEIC
02.png

ADDITIONAL PLUG

There is 1x plug near the dungeon basement door and 1x plug at the top of the stairs inside the Dungeon entrance

Dungeon Plugs.jpg
TUNNEL POWER

TUNNEL POWER

01.png

RUNNING POWER TO TUNNELS

You will need to run AC power cords (100 ft) from the centre beam to the basement.

LINE_edited.png
IMG_0055.HEIC
02.png

ADDITONAL PLUG

There are two plugs in the entrance stairwell to the tunnels.

LINE_edited.png
Tunnel Power 2.jpg
03.png

POWER ACCESS

A hole in the warehouse floor can be used to route power cables into the tunnels. The cover, which resembles a drain grate, must be removed to access the opening. This is not an active drain, and there is no risk of water exposure to the cables.

Tunnel power.jpg
LINE_edited.png
04.png

VIDEO VILLAGE

Video Village will need to be near the opening of the tunnels to get signal. We can clear the stairs before your shoot to accomidate this.

IMG_0063_edited.jpg
WATER

WATER

01.png

HOSE HOOK UP

The hose drop is behind the container in front of the dungeon entrance. Plug the hose into the spool on the floor and turn on the valve at the end.

IMG_7690.HEIC

© 2026 Evil Empire Studios Inc.

  • Instagram
  • Facebook
bottom of page