top of page
.png)
POWER
BREAKER PANELS
BREAKER PANELS & STUDIO POWER

BREAKER PANELS
Panel 1: located on the white wall in centre area near office containers
Panel 2: located around the corner from panel 1 between the container. and wall


POWER
The studio has 2x 15 amp plugs and 6x 20 amp plugs located on the centre beam.

DUNGEON POWER
DUNGEON POWER

ADDITIONAL PLUG
There is 1x plug near the dungeon basement door with an extension cord to the basement, and 1x plug at the top of the stairs inside the Dungeon entrance


RUNNING POWER TO DUNGEON
You will need to run AC power cords (100 ft) from the centre beam to the basement.

TUNNEL POWER
TUNNEL POWER

ADDITONAL PLUG
There are two plugs in the entrance stairwell to the tunnels.


RUNNING POWER TO TUNNELS
You will need to run AC power cords (100 ft) from the centre beam to the basement.


POWER ACCESS TO END OF TUNNEL
A hole in the warehouse floor can be used to route power cables into the end of the tunnels. The cover, which resembles a drain grate, must be removed to access the opening. This is not an active drain, and there is no risk of water exposure to the cables.


VIDEO VILLAGE
Video Village will need to be near the opening of the tunnels to get signal. We can clear the stairs before your shoot to accomodate this.

bottom of page